IBM X3950 M2 installation instructions Node Cable Setup

Page 14

IBM System x

4-node Cable Setup

14

Image 14
Contents IBM System IBM System Links to System Manuals 8u needed for 2-node system Install slides into rack Install nodes onto the slides Install Enterprise Cable Management Arms onto nodes Connect Scalability Cables to Scalability Ports Install and Route Scalability Cables Recommended Method Install and Route Scalability Cables- Recommended Method Connect power and IO cables to system and route through CMA Secure the cables in the CMA Remove cable slack from CMA hanger brackets Node Cable Setup Verify Cabling Feedback
Related manuals
Manual 19 pages 5.23 Kb