Chief Manufacturing PNR Series Reconfiguring the Swing Arms to Left or Right of Center

Page 12

PNR Series

Installation Instructions

Reconfiguring the Swing Arms to Left or Right of Center

1.Remove the display from the mount.

WARNING: The next step will release the arm assembly from the mount. The arms and plate may fall if you are not careful.

2.Remove four bolts (two on the top and two on the bottom) securing the swing arm assembly to the top and bottom mounting brackets. (See Figure 13)

Top bolts

Figure 13

3.Move the swing arm assembly left or right within slots to desired location.

Left of Center (See Figure 13).

Right of Center (See Figure 14).

4.Install four bolts (two on the top and two on the bottom) to secure the swing arm assembly to the top and bottom mounting brackets.

5.Tighten the bolts.

6.Install the display on the mount.

Top bolts

Figure 14

12

Image 12 Contents
PNR Series Disclaimer Dimensions Dimensions -- cont’d Tighten Fastener Pencil Mark Tools Required for Installation Installing Mount to Wall Wall Pilot HolesAdjusting PNR Height Installing Covers and End CapsMounting the Display Tension Adjustments Cable ManagementSwivel Tension Adjustment Swing Arm AdjustmentsReconfiguring the Swing Arms to Left or Right of Center Swing Arm Tension Adjustment Removing Display from Mount Installation Instructions PNR Series USA/International
Related manuals
Manual 16 pages 37.1 Kb