Chief Manufacturing PNR Series installation instructions Swing Arm Tension Adjustment

Page 13

Installation Instructions

PNR Series

Swing Arm Tension Adjustment

Swing arm tension is pre-set at the factory and is adjusted to accommodate displays with weights near the top of the mount’s capacity.

If smaller displays are used it may be difficult to reposition the display after mounting.

NOTE: The display must be mounted prior to adjusting swing arm tension.

To adjust swing arm tension to compensate for smaller display:

1.Place adjustment insert (F) into tension adjustment screw located at swing arm pivot point. (See Figure 15)

NOTE: The display may need to be repositioned in order to gain access to the tension adjustment screw(s).

2.Use the adjustment wrench (E) provided with the mount, turn adjustment insert clockwise to increase swing arm tension (See Figure 16) or counterclockwise to reduce swing arm tension. (See Figure 17)

NOTE: Small adjustments of 1/8 turn or less are typically all that is required to achieve desired tension.

3.Check swing arm tension. If desired tension is present, tension adjustment is complete. If additional tension adjustment is required, repeat steps 1 and 2 until desired tension is achieved.

NOTE: If changing from a smaller display to a larger display it may be necessary to increase swing arm tension.

(E)

Tension adjustment

screw

(F)

Figure 15

Increase tension

Figure 16

Reduce tension

Figure 17

13

Image 13
Contents PNR Series Disclaimer Dimensions Dimensions -- cont’d Tighten Fastener Pencil Mark Tools Required for Installation Wall Pilot Holes Installing Mount to WallInstalling Covers and End Caps Adjusting PNR HeightMounting the Display Cable Management Tension AdjustmentsSwing Arm Adjustments Swivel Tension AdjustmentReconfiguring the Swing Arms to Left or Right of Center Swing Arm Tension Adjustment Removing Display from Mount Installation Instructions PNR Series USA/International