Chief Manufacturing PNR Series installation instructions Cable Management, Tension Adjustments

Page 10

PNR Series

Installation Instructions

Cable Management

WARNING: IMPROPER INSTALLATION CAN LEAD TO SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! Make sure cables do not run through pinch points.

1.Thread cable ties (J) under cable clamps in mount arms. (See Figure 1)

Tension Adjustments

Vertical Tilt Tension Adjustment

1.With display mounted, check for desired vertical tilt tension.

2.Adjust the Centris Select knob until desired vertical tilt tension is obtained. (See Figure 9)

3.To lock the mount at the desired vertical tilt, tighten the vertical tilt lock screw. (See Figure 10)

Top view

1

Cable tie

Cable clamps

Cable tie

Figure 8

2.Route power/audio/video cables through the cable channel in top arm (See Figure 8), allowing sufficient slack in cables for left / right movement of display and swing arm, as well as swing arm extension and retraction.

3.Secure cables to top arm using two cable ties (J).

4.Repeat Steps 1 through 3, as necessary, for remaining top arm and lower arms.

WARNING: IMPROPER INSTALLATION CAN LEAD TO SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! DO NOT route cables through holes in faceplate.

Centris Select

adjustment knob

Figure 9

Vertical tilt

lock screw

Figure 10

10

Image 10
Contents PNR Series Disclaimer Dimensions Dimensions -- cont’d Tighten Fastener Pencil Mark Tools Required for Installation Installing Mount to Wall Wall Pilot HolesAdjusting PNR Height Installing Covers and End CapsMounting the Display Tension Adjustments Cable ManagementSwivel Tension Adjustment Swing Arm AdjustmentsReconfiguring the Swing Arms to Left or Right of Center Swing Arm Tension Adjustment Removing Display from Mount Installation Instructions PNR Series USA/International