Chief Manufacturing PNR Series Installing Mount to Wall, Wall Pilot Holes

Page 7

Installation Instructions

PNR Series

Installing Mount to Wall

WARNING: IMPROPER INSTALLATION CAN LEAD TO MOUNT FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! It is the installer’s responsibility to make sure the structure to which the mount is being installed is capable of supporting five times the combined weight of the mount and all attachments.

NOTE: The following instructions assume a suitable mounting structure and surface exists prior to installation.

CAUTION: To avoid personal injury, use an assistant when lifting, lowering or holding PNR during installation.

1.Determine mounting location taking into consideration display size and PNR’s range of movement.

2.Using a stud sensor locate two wood studs 16” on center. (See Figure 1)

 

16"

 

Wood Studs

(Wall)

Pilot

Holes

Figure 1

3.Place and level mount against wall, aligning mounting holes in upper and lower wall channels with studs. (See Figure 2)

4.Mark four mounting holes making sure mounting holes are located as close as possible to center of studs.

(See Figure 2)

5.Drill four 7/32" pilot holes where the mounting holes were marked. (See Figure 2)

1

3

3

4

 

5

x 4

Figure 2

7

Image 7
Contents PNR Series Disclaimer Dimensions Dimensions -- cont’d Tighten Fastener Pencil Mark Tools Required for Installation Wall Pilot Holes Installing Mount to WallInstalling Covers and End Caps Adjusting PNR HeightMounting the Display Cable Management Tension AdjustmentsSwing Arm Adjustments Swivel Tension AdjustmentReconfiguring the Swing Arms to Left or Right of Center Swing Arm Tension Adjustment Removing Display from Mount Installation Instructions PNR Series USA/International