Chapter 2 Using the NetFlow Collector User Interface
Reports
Figure 2-25 Scheduled Reports Window
Clicking Add Scheduled Report brings up the Add Scheduled Report window to add a new scheduled report. Clicking Edit in any row in the list of scheduled reports displays the Modify Scheduled Report window to modify the selected scheduled report. Clicking Remove in any row deletes the selected schedule report. The Add Scheduled Report and Modify Scheduled Report windows, as shown in Figure
Note Configuration updates for scheduled reports via the UI will not take effect until the Report Generator is restarted.
| Cisco NetFlow Collector User Guide |