Haier AU342XHERA, AU282XHERA installation manual Too outside

Page 13

Refrigerant piping work

4.Cutting and Flaring work of piping

Pipe cutting is carried out with a pipe cutter and burs must be removed. After inserting the flare nut, flaring work is carried out.

A

Flare tooling die

 

Pipe diameter*

Size A (mm)

Liquid side

6.35mm(1/4")

0.8~1.5

 

 

 

Gas side

9.52mm(3/8")

1.0~1.5

 

 

 

Correct

Incorrect

Lean Damage of flare Crack

Partial

Too outside

5.On drainage

Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.

It becomes high midway. The end is immersed in

It waves.

water

 

Less than 5cm

It gap with the ground

There is the bad smell

ts too small.

from a ditch.

Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out serely to outdoor.

In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

11

Image 13
Contents Outdoor Unit Installation Manual Contents Disposal of the old air conditioner Specifications Safety precautions Choose the installation place Installation accessoriesInstallation dimensionsmm Installation drawings of indoor and outdoor units Matching of the indoor and outdoor units For AU342XHERA Limitations on the installation Power sourceDescriptions Standard Maximum Refrigerant piping work Too outside Purging method to use vacuum pump Way valve Valve rod cap Service port capCorrect Pressing Wrong Pressing Terminal Block Clamps Wiring workWiring work Indoor unit a Items to confirm Test runningFailure State Trouble Possible Reasons Code Haier Group