Cisco Systems UCS C210 manual Installing Power Supplies, PSU1

Page 54

Chapter

Installing Power Supplies

The qualified and supported part numbers for this component are subject to change over time. For the most up-to-date list of replaceable components, see the following URL and then scroll to Technical Specifications:

http://www.cisco.com/en/US/products/ps10493/products_data_sheets_list.html

To replace or install a power supply, follow these steps:

Note If you have ordered a server with power supply redundancy (at least two power supplies), you do not have to power off the server to replace power supplies because they are hot pluggable.

Step 1 Remove a power supply or a blank panel from an empty bay:

a.Do one of the following actions:

If your server has only one power supply, shut down and power off the server as described in the “Shutting Down and Powering Off the Server” section on page 3-8.

If your server has two power supplies, the power supplies are hot pluggable so you do not have to shut down the server.

b.Remove the power cord from the power supply that you are replacing.

c.Push the release lever toward the center of the power supply and pull on the power supply handle to disengage it from the backplane (see Figure 3-8).

d.Remove the power supply from the bay.

Step 2 Install a new power supply:

a.Insert the new power supply into the bay and push it in until the release lever clicks and locks.

b.Replace the power cord to the new power supply.

c.Press the Power button to return the server to main power mode.

Figure 3-8 Removing and Replacing a Power Supply

 

PSU2

PSU1

195920

 

 

 

2

1

 

 

1

Power supply handle

2

Release lever

 

Cisco UCS C210 Server Installation and Service Guide

3-16

OL-20887-02

Image 54
Contents Covers UCS C210 Server Generations M1 and M2 Americas HeadquartersPage N T E N T S Replacing a SAS Extender or SAS Expander Card KVM Cable B-1 OL-20887-02 Organization Related DocumentationAudience Chapter Title DescriptionConventions Bewaar Deze InstructiesWarnung Wichtige Sicherheitshinweise Avvertenza Importanti Istruzioni Sulla SicurezzaAviso Instruções Importantes DE Segurança Guarde Estas InstruçõesGEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Feature or Component Cisco UCS C210 Server DVD+RW, DVD-R, DVD-ROM, DVD-RW, +R DL Chapter Installing the Server Shipping Box Contents Unpacking and Inspecting the ServerPreparing for Installation Installation GuidelinesSlide Rail Adjustment Range Rack RequirementsRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Initial Server Setup Connecting and Powering On the Server Standalone ModeOL-20887-02 Cisco UCS C210 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings System Bios and Cimc Firmware Updating the Bios and Cimc FirmwareAccessing the System Bios Service Jumper Locations Motherboard JumpersUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 Chapter Cisco UCS C210 Server Installation and Service Guide Server Configuration Utility Server Monitoring and Management ToolsCisco Integrated Management Interface Cimc Status LEDs Front Panel LEDsLED Name State Rear Panel LEDs 2shows the names and locations of the rear panel LEDsRear Panel LEDs LED Name State Preparing for Component Installation Shutting Down and Powering Off the Server Removing and Replacing the Server in a Rack Removing and Replacing the Server Top Cover Removing the Top Cover of the ServerRemoving and Replacing the Server Front Cover Removing the Front Cover of the ServerReplaceable Component Locations Replaceable Component Locations top viewInstalling or Replacing Components Installing Hard Drives and Solid State Drives Removing and Replacing Hard Drives and SSDs Installing Power Supplies PSU1Installing a DVD Drive Removing and Replacing a DVD drive Installing a Fan Tray Fan tray Fan tray securing screws two on each side Installing DIMMs Memory Performance Guidelines and Population RulesRear of Server Front of ServerMemory Population Rules Dimm Installation Procedure Memory Mirroring and RAS13 Removing and Replacing Memory Modules Installing CPUs and Heatsinks CPU Replacement ProcedureChapter 14 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery Installing a Trusted Platform Module TPM 15 Removing and Replacing a Motherboard Cmos BatteryTPM Replacing a PCIe Riser Card Assembly Riser card assembly top view Replacing a PCIe Card Replacing a PCIe CardChapter 19 Removing and Replacing a PCIe Card How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space Replacing a SAS Extender or SAS Expander SAS ExtenderSAS Expander Replacing a SAS Extender or SAS Expander Card Replacing an LSI MegaRAID Battery Backup Unit 22 and then connect the cable to the socket on the adapter22 Removing and Replacing an LSI BBU Installing a Mezzanine Card Mezzanine card retaining posts three Chapter Cisco UCS C210 Server Installation and Service Guide Physical Specifications Description SpecificationEnvironmental Specifications Power SpecificationsKVM Cable Supported Components Part NumberSupported Power Cords and Plugs LengthDescription Feet Meters Illustration AC Power Cord Illustrations This section contains the AC power cord illustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20887-02 RAID Controller Considerations Supported RAID Controllers and Required CablesMax Internal Opt Controller Style Drives RAID Levels Required CablesEnabling the Mezzanine Card RAID Controller in the Bios RAID Controller CablingHow to Determine Which Controller Is in Your Server Integrated ICH10RHow To Launch Option ROM-Based Controller Utilities From your For More Information OL-20887-02 Installation for Cisco UCS Integration OL-20887-02