Cisco Systems UCS C210 Related Documentation, Audience, Organization, Chapter Title Description

Page 7

Preface

This preface describes the audience, organization, and conventions of the Cisco UCS C210 Server Installation and Service Guide. It also provides information on how to obtain related documentation.

This guide covers UCS C210 Server Generations M1 and M2. Differences between the generations are noted in text.

Related Documentation

The documentation set for the Cisco Unified Computing System (UCS) C-Series rack-mount servers is described in the roadmap document at the following link:

Cisco UCS C-Series Documentation Roadmap

Audience

To use this installation guide, you must be familiar with electronic circuitry and wiring practices and preferably be a technician who is experienced with electronic and electromechanical equipment.

Organization

This guide is organized as follows:

 

 

Chapter

Title

Description

 

 

 

 

 

 

 

Chapter 1

Overview

Provides a brief overview of the Cisco Unified Computing

 

 

 

 

System (UCS) and the role that the Cisco UCS C210 server plays

 

 

 

 

in the Cisco Unified Computing System environment.

 

 

 

 

 

 

 

Chapter 2

Installing the Server

Describes how to install the server into a rack, how to cable and

 

 

 

 

power on the server, and how to connect to the service processor

 

 

 

 

and your network.

 

 

 

 

 

 

 

Chapter 3

Maintaining the Server

Identifies the replaceable components of the server and describes

 

 

 

 

how to replace them.

 

 

 

 

 

 

 

Appendix A

Technical

Lists physical, environmental, and power specifications.

 

 

 

Specifications

 

 

 

 

 

 

 

 

 

 

 

Appendix B

Cable and Power Cord

Lists specifications for the supported international power cords.

 

 

 

Specifications

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cisco UCS C210 Server Installation and Service Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OL-20887-02

 

 

 

vii

 

 

 

 

 

 

Image 7
Contents Americas Headquarters Covers UCS C210 Server Generations M1 and M2Page N T E N T S Replacing a SAS Extender or SAS Expander Card KVM Cable B-1 OL-20887-02 Chapter Title Description Related DocumentationAudience OrganizationBewaar Deze Instructies ConventionsAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseGuarde Estas Instruções Aviso Instruções Importantes DE SegurançaGEM Disse Anvisninger Xii Obtaining Documentation and Submitting a Service Request Xiv Overview Feature or Component Cisco UCS C210 Server DVD+RW, DVD-R, DVD-ROM, DVD-RW, +R DL Chapter Installing the Server Unpacking and Inspecting the Server Shipping Box ContentsInstallation Guidelines Preparing for InstallationRack Requirements Slide Rail Adjustment RangeRequired Equipment Installing the Server Into a Rack Attaching a Slide-Rail Assembly Attaching Mounting Brackets to the Server Attaching the Cable Management Arm Connecting and Powering On the Server Standalone Mode Initial Server SetupOL-20887-02 Cisco UCS C210 Server Installation and Service Guide NIC Modes and NIC Redundancy Settings Updating the Bios and Cimc Firmware System Bios and Cimc FirmwareAccessing the System Bios Motherboard Jumpers Service Jumper LocationsUsing the Bios Recovery Jumper J1E5 to Recover Corrupt Bios Clearing the Cimc Admin Password Using Jumper J45 Using the Clear Cmos Jumper J1E6 Clearing the Bios Admin Password Using Jumper J1E4 Chapter Cisco UCS C210 Server Installation and Service Guide Server Monitoring and Management Tools Server Configuration UtilityCisco Integrated Management Interface Cimc Front Panel LEDs Status LEDsLED Name State 2shows the names and locations of the rear panel LEDs Rear Panel LEDsRear Panel LEDs LED Name State Preparing for Component Installation Shutting Down and Powering Off the Server Removing and Replacing the Server in a Rack Removing the Top Cover of the Server Removing and Replacing the Server Top CoverRemoving the Front Cover of the Server Removing and Replacing the Server Front CoverReplaceable Component Locations top view Replaceable Component LocationsInstalling or Replacing Components Installing Hard Drives and Solid State Drives Removing and Replacing Hard Drives and SSDs PSU1 Installing Power SuppliesInstalling a DVD Drive Removing and Replacing a DVD drive Installing a Fan Tray Fan tray Fan tray securing screws two on each side Memory Performance Guidelines and Population Rules Installing DIMMsFront of Server Rear of ServerMemory Population Rules Memory Mirroring and RAS Dimm Installation Procedure13 Removing and Replacing Memory Modules CPU Replacement Procedure Installing CPUs and HeatsinksChapter 14 Removing and Replacing CPUs and Heatsinks Installing a Motherboard Cmos Battery 15 Removing and Replacing a Motherboard Cmos Battery Installing a Trusted Platform Module TPMTPM Replacing a PCIe Riser Card Assembly Riser card assembly top view Replacing a PCIe Card Replacing a PCIe CardChapter 19 Removing and Replacing a PCIe Card How to Identify Which Power Supply Model is in Your Server Resolving Insufficient Memory Space to Execute Option ROMs Resolving Insufficient 16-Bit I/O Space SAS Extender Replacing a SAS Extender or SAS ExpanderSAS Expander Replacing a SAS Extender or SAS Expander Card 22 and then connect the cable to the socket on the adapter Replacing an LSI MegaRAID Battery Backup Unit22 Removing and Replacing an LSI BBU Installing a Mezzanine Card Mezzanine card retaining posts three Chapter Cisco UCS C210 Server Installation and Service Guide Description Specification Physical SpecificationsPower Specifications Environmental SpecificationsSupported Components Part Number KVM CableLength Supported Power Cords and PlugsDescription Feet Meters Illustration This section contains the AC power cord illustrations AC Power Cord IllustrationsCAB-9K10A-EU CAB-9K10A-SW CAB-N5K6A-NA CAB-9K12A-NA OL-20887-02 Supported RAID Controllers and Required Cables RAID Controller ConsiderationsRAID Levels Required Cables Max Internal Opt Controller Style DrivesRAID Controller Cabling Enabling the Mezzanine Card RAID Controller in the BiosIntegrated ICH10R How to Determine Which Controller Is in Your ServerHow To Launch Option ROM-Based Controller Utilities From your For More Information OL-20887-02 Installation for Cisco UCS Integration OL-20887-02