Kenmore 153.33204, 153.33206 Vertical Vent Termination Restrictions, Vertical Vent Through Roof

Page 20

FIGURE 23.

This unit can vent through 2”, 3” or 4” nonmetallic pipe and fittings.

The vent pipe installation can be started from either the blower discharge or the termination wall. Keep in mind the total vent system (pipe and elbows) when installing the vent system, see VENTING AND INSTALLATION AND MAXIMUM VENT LENGTHS, page 17.

FIGURE 24.

The vent terminal should be kept as close as possible to the outside wall, but you need to allow at least 1.5” (3.8 cm) of pipe past the wall, for the wall flange and vent terminal to mount on the pipe.

Before the vent terminal is installed, caulk (not supplied) around the pipe on the exterior wall and install the optional wall flange. The flange can be held to the outside wall by placing some of the caulking on the back of the flange. The wall flange is supplied for decorative purposes only and is not a requirement for the vent termination (if not needed by the installer).

VERTICAL VENT TERMINATION RESTRICTIONS

1.Minimum of twelve 12” (30.5 cm) above the roof or twelve 12” (30.5 cm) above the anticipated snow level. Provide proper support for all pipe protruding through the roof.

VERTICAL VENT THROUGH ROOF

This unit is approved for venting through the roof with the type vent terminal that is included with the unit. A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof.

The total vent system should not exceed that which is specified, see VENTING AND INSTALLATION, page 17.

All of the pipe should be secured as per the instructions in the instructions

in the VENTING AND INSTALLATION, page 17.

20

 

FIGURE 25.

2.4’ (1.2 m) from or 1’ (0.3 m) above any gable, dormer, or other roof structure with access to interior of building (i.e.-vent, window etc.).

3.3’ (0.9 m) above any forced air inlet located within 10’ (3.0 m).

Image 20
Contents 153.332040 153.332050153.332060 153.332070Safe INSTALLATION, USE and Service Important DefinitionsSafety Precautions Table of Contents Product Specifications Customer ResponsibilitiesKeep Clear of ALL Obstructions Materials and Basic Tools Needed Propane HOT Surface Igniter & Main Burner Typical InstallationNatural HOT Surface Igniter & Main Burner Installation Instructions Removing the Old Water HeaterFacts to Consider about the Location Insulation Blankets Cause death, serious bodily injury, or property damageALL AIR from Inside Buildings See Water Piping Hotter Water can ScaldValve and Pipe Insulation if supplied GAS Piping Blower Assembly Installation Sequence of InstallationSediment Traps Filling the Water HeaterPage Vent Connections to Blower Assembly Venting and InstallationCondensation Maximum Vent LengthsVent Terminal Installation VentingVertical Vent Termination Restrictions Vertical Vent Through RoofVent Pipe Preparation Recommended BRUSH* Size for Primer Cement ApplicationsStep B Step EStep F Step GFor Your Safety Read Before Lighting Operating InstructionsTemperature Regulation Temperature SettingStart UP Conditions CondensateSMOKE/ODOR Thermal ExpansionBurner Operation and Inspection Operational ConditionsVenting System Inspection Anode ROD Inspection TEMPERATURE-PRESSURE Relief Valve OperationHousekeeping Draining Drain Valve Washer ReplacementService Leakage Checkpoints LED Status Problem Solution Blower may not start in thisCondition Blower may run continuouslyTroubleshooting Guidelines Troubleshooting Guidelines Model Numbers Part Description Burner Assembly Outer Door AlternateThis is a Repair Parts LIST, not a Packing List Page Page Year Limited Warranty on Water Heater Year Exclusive Kenmore Labor WarrantyWarranty Service Sears Installation Service