AF2
AC2
AB1
AG1
S T E P 4 GREEN BAG
•Attach the bearing tubes (AF2) to the over- head lat arm (AC2) with four bolts (M6x15).
•Lift the overhead lat arm (AC2) and set atop the upright frame (AG1) and the brackets in the weight stack tower (AB1). Slide two bolts (M10x98) with two flat washers (10.2x22x2) up through each bracket on weight stack tower and secure with two flat washers (10.2x22x2) and two nylon nuts (M10). Secure to top of upright frame by sliding two bolts (M10x95) with two flat washers (10.2x22x2) down through holes in overhead lat arm. Secure with two flat washers (10.2x22x2) and two nylon nuts (M10). Tighten all hardware.
12