Vision Fitness ST730 manual E P 4 Green BAG

Page 12

AF2

AC2

AB1

AG1

S T E P 4 GREEN BAG

Attach the bearing tubes (AF2) to the over- head lat arm (AC2) with four bolts (M6x15).

Lift the overhead lat arm (AC2) and set atop the upright frame (AG1) and the brackets in the weight stack tower (AB1). Slide two bolts (M10x98) with two flat washers (10.2x22x2) up through each bracket on weight stack tower and secure with two flat washers (10.2x22x2) and two nylon nuts (M10). Secure to top of upright frame by sliding two bolts (M10x95) with two flat washers (10.2x22x2) down through holes in overhead lat arm. Secure with two flat washers (10.2x22x2) and two nylon nuts (M10). Tighten all hardware.

12

Image 12
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Orange BAG Blue BAGPink BAG E E N B a GBlack BAG Yellow BAG E P 1 Orange BAG AT3 AT2 AT1Blue BAG Pink BAG E P 4 Green BAG Cable #1 B L E # E P 7 B L a C K B a G E P 8 Yellow BAG Page Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST730 Commercial Warranty Page Page Page Page S i o n