Vision Fitness ST730 manual B L E #

Page 14

S T E P 6

C A B L E # 2

• Remove pulley M and one of the rollers (GO9) in the front of the upright frame (AG1). Guide the bolt end of cable #2 (F18) through the hole, routing towards the rear in upright frame (AG1), and reinstall roller (G09) and pulley M for the cable to wrap around (bottom). Remove the bottom pulley (L) on the floating tri-pulley (AF1), place the cable (F18) inside, and reinstall pulley. Guide the cable back down towards the pulley bracket in the upright frame, and thread the cable bolt into the hole behind pulley M, making sure the bolt is threaded in as far as possible (0.5” minimum). Tighten the nut to the connection point.

AF1

L

AG1

M

G09

F18

14

Image 14
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Orange BAG Blue BAGPink BAG E E N B a GBlack BAG Yellow BAGE P 1 Orange BAG AT3 AT2 AT1Blue BAG Pink BAG E P 4 Green BAG Cable #1 B L E # E P 7 B L a C K B a G E P 8 Yellow BAG Page Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST730 Commercial Warranty Page Page Page Page S i o n