Vision Fitness ST730 manual Cable #1

Page 13

S T E P 5

F G

AF2

K

H

D C

I

 

J

B

AF1

A

F17

E

CABLE #1

Remove pulley A from the left overhead pulley bracket (AF2) and guide one end of cable #1 (F17) through housing on the bracket. Reinstall pulley, making sure cable is between pulley and small roller in front of the bracket. Guide the cable along the overhead arm, through pulleys B, C, and D. Remove pulley E from weight stack pulley bracket, reinstalling after guiding the cable through. Bring cable back up weight stack and around pulleys F, G, and H. Remove pulley I from the right side overhead pulley bracket and guide end of cable through housing. Reinstall the pulley with cable in between it and small roller.

Take the floating tri-pulley bracket assembly (AF1) and hang the upper left (J) and right (K) pulleys from the cable (F17) you just installed. In between pulleys B and C on the overhead lat arm, pull the cable down and wrap around pulley J on the assembly. Repeat on the other side by wrapping the cable around pulley K, after pulling down between pulleys G and H. See diagram for clarification.

13

Image 13
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Blue BAG Orange BAGE E N B a G Pink BAGYellow BAG Black BAGAT3 AT2 AT1 E P 1 Orange BAG Blue BAG Pink BAG E P 4 Green BAG Cable #1 B L E # E P 7 B L a C K B a G E P 8 Yellow BAG Page Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST730 Commercial Warranty Page Page Page Page S i o n