Graham Field 765000 user manual Installation, Unpacking, Pump and Mattress Setup

Page 13

INSTALLATION

UNPACKING

1.Carefully remove all components from the carton.

2.Inspect all components.

3.If damage is evident to the contents, please notify the carrier and your Graham-Field equipment provider.

PUMP AND MATTRESS SETUP

1. Remove all sheets, blankets, and pillows from the bed.

2.Place the mattress on top of the bed frame; ensure that the foot end symbol faces up at foot end as shown at right. Secure mattress to bed with straps.

3.Fold open the wire hangers on the back of the pump as shown at right.

4.Either hang the pump on the bed's foot end, as shown at right, or place the pump on a flat surface easily accessible to the caregiver and/or doctor.

Caution: Place the device in a position where the caregiver and/ or doctor can access it easily.

5.Connect the mattress-pump air hose quick connector; ensure that the connector has clicked securely into place before continuing.

hanger

Caution: Ensure that the air hoses are not kinked or tucked under the mattress.

765000-INS-LAB-RevB10

13

Image 13
Contents 765000 Contents Intended USE of this Device IntroductionImportant Safety Precautions INS-LAB-RevB10 INS-LAB-RevB10 Equipment Symbols Pump and Mattress System Product DescriptionPump Front Pump RearFront panel, first row Pump Front Panel Front panel, second row Front panel, third row Power failure. Depress the alarm mute button to disable Pump and Mattress Setup InstallationUnpacking INS-LAB-RevB10 Getting Started OperationQuick Disconnect CPR Function Transport CAPCleaning MaintenanceGeneral Maintenance Air filter replacement Fuse replacementStorage Pump Specification SpecificationsLimited Warranty Appendix a EMC Information INS-LAB-RevB10 =1.2 P = 2.3 P GF Health Products, Inc
Related manuals
Manual 24 pages 11.97 Kb