Vision Fitness ST720 manual Pink BAG

Page 13

S T E P 3

PINK BAG

Take the swing arm support (AC3) and insert into the end of the main floor support tube (AC1). Align holes in both tubes. Vertically insert and tighten two bolts (M10x20) and two flat washers (10.2x22x2).

Place the swing arm pulley bracket (AC2) over the main floor support, aligning the holes along the intersection point of swing arm support (AC3) and main floor support (AC1). Secure in place using four bolts (M10x123), eight flat washers (10.2x22x2), and four nylon nuts (M10). Attach the rear bracket (AC2) to the swing arm support (AC3) by sliding two bolts (M10x70) and two flat washers (10.2x22x2) through and fastening two flat washers (10.2x22x2) and two nuts (M10).

Attach the weight stack connecting brace (AG1) to the weight stack tower using two bolts (M10x60), four flat washers (10.2x22x2), and two nylon nuts(M10). Attach other side of connecting brace to swing arm support using two bolts (M10x120), four flat washers (10.2x22x2), and two nylon nuts (M10).

13

Image 13
Contents S e m b l y & O w n e r ’s G u i d e Page Table of Contents S e m b l y N e r ’ s G u i d e E P Blue BAG Pink BAG Black BAG Green BAGRED BAG Yellow BAGPurple BAG E P 1 Orange BAG Blue BAG Pink BAG E P 4 Green BAG E P 5 B L a C K B a G E P 6 Y E L L O W B a G D B a G E P 8 Light Blue BAG E P 9 Purple BAG Resistance Training Benefits and Tips Training Programs Stretching BICEP/CHEST Stretch E M ST720 Commercial Warranty Page Page Page Page Page Page S i o n