S T E P 2 | BLUE BAG |
• Slide a bolt (M10x125) and a flat washer (10.2x22x2) through the hole, right of center, on the seat back support post (AT3). Attach another flat washer (10.2x22x2) and a nut (M10) to the back side.
• Place the
• Grab the other center floor support (with pulley) (AG2) and slide the end without the pulley bracket up to holes next to where other center floor support (AG3) was just installed. Secure using two bolts (M10x125 on the inside and M10x120 on the outside of the bracket), four flat washers (10.2x22x2), and two nylon nuts (M10).
• Stand the weight stack tower (AB1) upright and place it against both center floor supports. Slide four bolts (M10x70) and four flat washers (10.2x22x2) through connecting holes, and secure bolts with four more flat washers (10.2x22x2) and four nylon nuts (M10).
M10x120
M10x125
M10x120
12