S T E P 7 | R E D B A G |
•Attach pulleys A and B to the weight stack tower with a bolt (M10x48), a flat washer (10.2x22x2) on each side, and a nut (M10).
•With loop end of cable (F17) in hand, guide it through hole in top of weight stack tower and around pulleys A and B. Follow the weight stack down to go around pulley C. Loosen pulley D and make sure the cable is routed between the pulley and the post. Retighten. Weave the cable around pulley E, F, and G. Terminate after placing the loop through the bottom of the swing arm tube, where it will be secured by slid- ing a 15x21.5 bushing, a bolt (M10x68), and a flat washer (10.2x22x2) through the hole in the swing arm and through the
loop in the cable. Secure with another bush- ing (15x19.5), a flat washer (10.2x22x2) and a nylon nut (M10), after exiting the opposite side of tube.
•Remove nut on bolt end of cable and place the weight pin tether (K09) on bolt shaft. Thread the nut on the bolt end of the cable all the way to the head of the bolt. Thread the bolt into the header plate, making sure that there is a minimum of 0.5” of engagement. Secure by tightening nut onto header plate.
Cable Termination
Detail
Bottom View
17