INTRODUCTION IMPORTANT PRECAUTIONS
ASSEMBLY
A S S E M B LY STEP 3
HARDWARE BAG 3 CONTENTS : |
|
|
BOLT (G) | SPRING WASHER (H) | FLAT WASHER (B) |
20 mm | 20 mm | 20 mm |
Qty: 4 | Qty: 4 | Qty: 4 |
A S S E M B LY STEP 4
HARDWARE BAG 4 CONTENTS :
BOLT (I) 15 mm Qty: 4
IMPORTANT PRECAUTIONS INTRODUCTION
ASSEMBLY
BEFORE YOU BEGIN
TREADMILL OPERATION
CONSOLE CABLES
CONSOLE
DO NOT ATTACH
THIS SIDE UNTIL STEP
CONSOLE MAST
FLAT WASHER (B)
SPRING WASHER (H)
BOLT (G)
*Note: Be careful not to pinch any wires while attaching the console.
CONSOLE MAST
SUPPORT BAR
BOLT (I)
A Open Hardware Bag 4. |
B Align SUPPORT BAR with holes in CONSOLE MASTS. |
BEFORE YOU BEGIN
TREADMILL OPERATION
CONDITIONING TROUBLESHOOTING LIMITED
GUIDELINES & MAINTENANCE WARRANTY
10
AOpen HARDWARE BAG 3.
BWith running deck in lowered position, place console on upright masts. Align the brackets that are underneath the console with the top holes of the upright masts.
CTo assemble the left CONSOLE MAST to the CONSOLE, insert 1 BOLT (G), 1 SPRING WASHER (H) and 1 FLAT WASHER (B) into the 2 holes in the left CONSOLE mast and lightly tighten.
DGently lift right side of the console to connect the console cables. Carefully tuck wires in mast to avoid damage. NOTE: Do not pinch console cable or grip pulse wires.
ERepeat step C above to attach the right console mast to the console.
FLeave console bolts loose until after step 4 is completed.
C Insert BOLTS (I) into all 4 holes of the SUPPORT BAR. |
NOTE: Look into holes in the right mast before inserting bolts to avoid pinching cables. |
D Tighten all console bolts (Step 3) and support bar bolts (Step 4) completely. |
11
LIMITED TROUBLESHOOTING CONDITIONING WARRANTY & MAINTENANCE GUIDELINES
GS_1035T_Treadmill_Rev.2.3.indd | 6/13/07 11:18:42 AM |