9.Orient the two Pulley Housings (26) as shown. Slide the Eyebolt/Pins (51, 52) into a set of holes in the Pulley Tubes (12).
Route a Nylon Rope (23) through a Pulley Housing (26) in the direction shown. Route the other Nylon Rope through the other Pulley Housing as shown.
10.Insert the ends of the two Rope Storage Knobs
(31)into the square holes in the Carriage Plates (49, not shown). Attach the Rope Storage Knobs to the Carriage (6) with two M6 x 61mm Screws
Route the Nylon Ropes (23) through the Rope Grips (28). Pull on the Ropes so that they are secure in the teeth on the Rope Grips.
Wrap the ends of the Nylon Ropes (23) around the Rope Storage Knobs (31).
11.Make sure that all parts have been properly tight- ened. The use of the remaining parts will be explained in ADJUSTMENTS, beginning on the following page.
9 | 51 |
|
|
|
|
| |
52 | 26 | 12 |
|
|
| ||
|
|
| |
23 |
| 23 |
|
|
|
| |
12 |
|
|
|
10 |
|
|
|
|
|
| 31 |
|
|
| 47 |
| 28 |
|
|
| 31 | 23 | 6 |
|
| ||
|
|
| |
| 47 |
|
|
7