ParaBody 893103 manual

Page 11

FIGURE 14

STEP14:

¯SECURELYassemble the BEARINGHOUSING(13) and the CENTERPULLEYBRACKET(16) to the UPRIGHTFRAM~ using two 1/2 X 3-1/4" BOLTS(26) and two 1/2" LOCKN't~S(34) as shown in FIGURE

STEP15:

¯Insert fot~ 2" SQ. ENDCAPS(47) into the LEFT(15) & RIGHT PEC ARMSas shown in FIGURE15.

Slide two 4 X 12" ROLLERPADS(21) onto the LEFT (15) & RIGHT

(14)PEC ARMSas shox~ in FIGURE15. (TIP: Spray window cleaner on the inside of the roller pad to help ease assembly.)

FIGURE 15

11

Image 11
Contents Serious Ste~ Iiiiiii Parts List Step ~8 X 2-3/4 Step THECABLE25 is in Thegrooveof Thepulleys Securelytightenall Looseconnectionsmadeup to this Point FIGUR~ Page Page II I I ~ Cable Diagram Step 318X2 318 X 2-3/4 Page Page Page Page This Concludesthe Assemblyof the 893103 PRO System