
FIGURE 6
STEP6:
Pull back the SPRINGPINand slide the SAFETYRAILS(9) over the UPRIGHTS(5) until the S]?I~[NGPINis engagedin ftrst hole.
¯Slide the CARRIAGE(3) over the LrpRIGHTFR.AME(1) as sho~ in FIGURE
STEP7:
¯Insert one 3 X 2" ENDCAP(44) into the TOPBOOM(2) as shownin FIGURE
¯Route end of CABLE(25) (WITHOUTBALL)through the TOPBOOM(2) as shower in FIGURE
¯SECURELYassemble two