ParaBody 893103 manual Ii I I ~

Page 12

~FIGURE16

STEP16:

¯Assemble the LEF'r (15) & RIGHT(14) PEC ARMSto the BEARINGHOUSING(13) using fotu' 314" FL.~TGE BEARING

(41)and two 3/4" CAPNUTS(52) as shown in]

2-3/4"

STEP 17:

¯SECURELYassemble BACKPAD (19) to the UPRIGHTFRAME(1) using two 3/8 X 2-3/4" BOLTS (28) and two 3/8" LOCKWASKERS

(33)as shown in FIGURE17.

FIGURE 17

d; I 6

I__I I I ~

Image 12
Contents Serious Ste~ Iiiiiii Parts List Step ~8 X 2-3/4 Step THECABLE25 is in Thegrooveof Thepulleys Securelytightenall Looseconnectionsmadeup to this Point FIGUR~ Page Page II I I ~ Cable Diagram Step 318X2 318 X 2-3/4 Page Page Page Page This Concludesthe Assemblyof the 893103 PRO System