ParaBody 893103 manual Securelytightenall Looseconnectionsmadeup to this Point

Page 8

Rout

overbolts.1/2X3"

1/2 X3"I

l

FIGURE 8

STEP8:

-

¯LOOSELYassembleLhcTOPBOOM(2)to theUPRIGHTFRAME(I)usingtwoI/2X 3" BOLTS(27),one3/8X

BOLT(25),oneI/2"LOCKWASHER(32),I/2"WASHER (30),one I/2" LOCKNUT (34),and one 3/8" LOC~-"I (36) as shown~ FIGUI~8.

112X3-1/4"

1/2 X 3"

CABLE

overbolts.

1/2 X3"

FIGURE 9

STEP9:

¯LOOSELYassemble the LEFT(7) & RIGHT($) BOOMSUPPORTSto the UPRIGHTS(5) and TOPBOOM(2) using

X 3" BOLTS(27), two 1/2 X 3-1/4" BOLTS(26), two 1/2" LOCKWASHERS(32), two I/2" WASHERS(30), and four LOCKNUTS(34) as shown in FIGURE

* SECURELYTIGHTENALL LOOSECONNECTIONSMADEUP TO THIS POINT!

0

1

{ ! l I

3

4

5

[ I I6

I

I [ I I

1

8

 

[ ! I_1

 

 

 

 

 

 

 

 

 

 

Image 8
Contents Serious Ste~ Iiiiiii Parts List Step ~8 X 2-3/4 Step THECABLE25 is in Thegrooveof Thepulleys Securelytightenall Looseconnectionsmadeup to this Point FIGUR~ Page Page II I I ~ Cable Diagram Step 318X2 318 X 2-3/4 Page Page Page Page This Concludesthe Assemblyof the 893103 PRO System