7. Seal hole at the bottom of the bottom pole with
50
Heavy-Duty Tape
(Not Included)
8.
Fill pole with concrete approximately 1” (2.54 cm) below bottom elevator hole as shown.
1
IMPORTANT!:
FAILURE TO FILL YOUR POLE COMPLETELY WITH CONCRETE AS DESCRIBED IN THESE INSTRUCTIONS WILL VOID ALL WARRANTIES WRITTEN AND IMPLIED.
IMPORTANT!:
Make sure that concrete does not bulge from the end of pole assembly. Allow concrete to completely cure.
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.
CONCRETE MUST CURE.
23 | 10/04 | P/N 21168202 |