Huffy 21168202 manual Side View

Page 10

6. Fill hole completely with concrete.

3

5

4

1" (2.54 cm)

IMPORTANT!: CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions

7. several times while concrete is curing.

1" (2.54 cm)

NOTE A:

Make a reference mark here for anti-skid tape.

NOTE B:

Keep flange pushed down to concrete and leveled.

1" (2.54 cm)

DRAINAGE HILL

PLAYING SURFACE

SIDEVIEW

IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE

GOING ON TO NEXT STEP. CONCRETE MUST CURE.

P/N 21168202 10/04

10

Image 10
Contents Inground System Before YOU Start Safety Instructions Parts List See Hardware Identifier Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 21168202 10/04 Container to Mix Phillips-Head Screwdriver 4 Wrenches 21168202 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Heavy-Duty Tape Not Included Install clips NET Installation None Use wedge to gently tap cap of ground sleeve 5 until tight 10 ft 05 m