Spalding manual 12/06 ID# M682001

Page 19

Install handle assembly (17) to lower elevator tubes (32) using bolt (29),

7. spacers (50), and nut (31) as shown.

50

17

50

31

29

8.

Secure the handle assembly (3 & 17) to pole bracket

9.

Secure the front panel (21) to struts (2) as

(15) using bolt (20) and nut (10) as shown.

shown with carriage bolts (22) and nuts (14).

 

3

 

20

15

21

22

 

42

 

10

 

14

NOTE:

Loosening the strut- to-pole bolt (12) can help when aligning front cover to struts.

WARNING!

Retighten bolt (12) when front cover attachement is completed.

19

12/06

ID# M682001

Image 19
Contents Portable System Before YOU Start Safety Instructions Get to know the basic parts of your basketball system Parts List See Hardware Identifier #51 #39 #12 #18 #23 #26 #25 #16 #20 #22 #45 Hardware Identifier Plastic Spacers Caps & Clips Fig. a Hole Hole Do not Tighten Completely Do not Over Tighten Completed Assembly Section B Attach the Backboard 12/06 ID# M682001 USE EYE Protection When Installing Springs Install Slam Jam Rim to Backboard Screws removed in step 12/06 ID# M682001 If Using Sand 2 Gallons of ANTI-FREEZE is not Required RIM Cover Attachment Items Required for this Section Board PAD Installation