Spalding M682001 manual Fig. a

Page 8

SECTION A: ASSEMBLE THE BASE

This is what your system will look like when you’ve finished this section.

TOOLS REQUIRED FOR THIS SECTION

(2) Wrenches

9/16”, 1/2”

AND/OR

(2) Socket Wrenches and Sockets

Sawhorse or support table

Extension

1/2” 9/16”

1. Complete wheel assembly as shown in Figure A. Secure wheel bracket (7) and wheel assembly (Fig. A.) to the tank (1) with a bolts (18) and washers (24).

18

24

1

18

24

Fig. A.

Wood Block

NOTE:

TO INSTALL SECOND PUSHNUT:

Assemble Pushnut, Wheels, Axle, And Wheel Bracket As Shown.

Support Pushnut/Axle From The End With A Block Of Wood To Install The Second Pushnut Onto The Axle.

7

7

9

13

13

8

8

ID# M682001

12/06

8

Image 8
Contents Portable System Before YOU Start Safety Instructions Get to know the basic parts of your basketball system Parts List See Hardware Identifier #51 #39 #12 #18 #23 #26 #25 #16 #20 #22 #45 Hardware Identifier Plastic Spacers Caps & Clips Fig. a Hole Hole Do not Tighten Completely Do not Over Tighten Completed Assembly Section B Attach the Backboard 12/06 ID# M682001 USE EYE Protection When Installing Springs Install Slam Jam Rim to Backboard Screws removed in step 12/06 ID# M682001 If Using Sand 2 Gallons of ANTI-FREEZE is not Required RIM Cover Attachment Items Required for this Section Board PAD Installation