Spalding M866041 manual Install threaded ends of J-bolts 19 through holes

Page 5

1.

Ensure ground is level with playing surface, then dig pole hole.

 

 

WARNING!

24" (61 cm)

GROUND SURFACE

48" (121.9 cm)

CONTACT UTILITIES

BEFORE DIGGING.

24" (61 cm)

48" (121.9 cm)

PLAYING SURFACE

2.

Install nut (25) to J-bolt (19) as shown. Repeat procedure for remaining three J-bolts (19).

IMPORTANT!:

Make sure nuts (25) are 2.75” (7 cm) from top of J-bolts

25

2.75”

(7 cm)

19

25

2

25

3.

Install threaded ends of J-bolts (19) through holes

in mounting plate (2) and secure as shown.

 

 

 

NOTE:

Make sure J-bolts (19) are in the illustrated position.

Nuts on the top of plate are used for leveling the pole after system is fully assembled.

19

5

05/05

ID# M866041

Image 5
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Mounting plate 2 and secure as shown Install threaded ends of J-bolts 19 through holesBuild drainage hill Side ViewInsert bushings 27 into areas shown Mounting plate 2 as shown Playing SurfaceCompleted Assembly ID# M866041 05/05 Lower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Yokes 18 Attach backboard 10 to upper and lowerRim Assembly Screws 29 into place with a rubber mallet Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Playing 05/05 ID# M866041 Feet 3.05 m Limited Lifetime Warranty