Spalding M866041 manual Playing Surface, Mounting plate 2 as shown

Page 8

7A.

Rest top of pole on a piece of scrap wood (not included) and line up holes in pole to holes in

 

mounting plate (2) as shown.

WARNING!

THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

2

PLAYING SURFACE

SCRAP WOOD

(NOT INCLUDED)

PLAYING SURFACE

7B.

Insert bolt (15) through holes in plate and pole and secure with nut (22).

1

15

22

ID# M866041

05/05

8

Image 8
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install threaded ends of J-bolts 19 through holes Mounting plate 2 and secure as shownSide View Build drainage hillInsert bushings 27 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly ID# M866041 05/05 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Attach backboard 10 to upper and lower Yokes 18Rim Assembly Screws 29 into place with a rubber mallet Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Playing 05/05 ID# M866041 Feet 3.05 m Limited Lifetime Warranty