4. | Fill hole with concrete. Tamp down concrete to release air pockets |
| and build drainage hill. |
DRAINAGE HILL
1" (2.54 cm)
PLAYING SURFACE
|
|
|
| SIDE VIEW |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. | Insert |
| ||||
any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to |
| |||||
|
| |||||
| level mounting plate on top of drainage hill. Level mounting plate and square with playing surface. |
| ||||
| Clean off any excess cement on mounting plate at this time and place washers (24). |
| ||||
|
|
|
|
|
|
|
IMPORTANT!:
Check leveling of mounting plate several times with carpenter’s level while concrete is curing.
IMPORTANT!: |
| |
Front of mounting plate |
| |
(2) must be parallel with | PLAYING SURFACE | |
playing surface. | ||
|
24
24
24
2
24
IMPORTANT!: WAIT A MINIMUM OF 72 HOURS BEFORE GOING ON
TO NEXT STEP. CONCRETE MUST CURE. ALLOW ADDITIONAL TIME
FOR COLD, WET OR HUMID WEATHER.
ID# M866041 | 05/05 | 6 |