
10.  | Start two Handrail Bolts (8) with two Handrail  | 10  | 
  | 
  | 
  | Star Washers (5) into the Uprights (53, 54).  | 
  | 
  | |
  | 
  | 
  | 
  | |
  | Then, firmly tighten all six Handrail Bolts.  | 
  | 
  | 
  | 
  | With the help of a second person, carefully  | 
  | 
  | 
  | 
  | lower the Uprights (53, 54) to the floor.  | 
  | 
  | 
  | 
  | 
  | 8  | 5  | 
  | 
  | 
  | 
  | 53  | 
  | 
  | 
  | 
  | 
  | 54  | 
  | 
  | 
  | 8  | 5  | 
11. Attach the ground wire on the Wire Harness (39)  | 11  | 
  | 
  | |
  | to the indicated hole in the Base (52) with a  | 
  | 
  | |
  | 
  | 
  | 
  | |
  | Ground Screw (84).  | 
  | 
  | 
  | 
  | 
  | 
  | 52  | 
  | 
  | Ground Wire  | 
  | 
  | 
  | 
  | Hole  | 39  | 84  | 
  | 
  | 
  | 
  | 
  | |
12. Tighten two Belly Pan Screws (20) into the Belly  | 12  | 65  | 
  | 
  | 
Pan (66) and the Hood (65). Be careful not to  | 
  | 
  | ||
  | 
  | 
  | ||
overtighten the Belly Pan Screws. | 
  | 
  | 
  | 
  | 
  | 20  | 
  | 
  | 
  | 
  | 
  | 
  | 66  | 20  | 
  | 
  | 
  | 
  | |
  | 10  | 
  | 
  | 
  |