2. Identify the Right Upright (108) and the Left Upright (73) |
| 2 |
|
| |
by observing the positions of the indicated brackets. See |
| 42 | Brackets | ||
|
| ||||
the inset drawing. Make sure that there are two |
|
|
|
| |
(118) in the lower end of each Upright. |
|
|
|
| |
Straighten the Wire Harness (42), and feed it into the |
| 69 | 108 |
| |
|
|
|
| ||
lower end of the Right Upright (108) and out of the upper |
|
|
|
| |
end. |
|
|
|
|
|
Open part bag B. | Hold the Right Upright (108) against the | 48 |
| 73 | |
|
| ||||
right side of the Base (69 ), with the bracket on the side | 61 |
|
| ||
shown. Hand tighten | two 3” Bolts (61) with two 5/16” Star |
|
| ||
|
|
| |||
Washers (48) into the Base and the Right Upright; | be |
|
|
| |
careful not to damage the Wire Harness (42). |
|
|
|
| |
With the help of a second person, carefully tip the tread- |
|
|
| 73, 108 | |
|
|
|
| ||
mill onto its other side. Attach the Left Upright (73) and |
|
|
|
| |
the other Wheel (not shown) as described above. Note: |
|
|
|
| |
There is not a wire harness on the left side. |
|
|
| 118 | |
3. With the help of a second person, raise the Right Upright |
| 3 |
|
| |
(108) and the Left Upright (not shown) to the vertical po- |
|
| |||
|
|
| |||
sition. |
|
| Large |
|
|
|
|
|
|
| |
Identify the Right Handrail (72), which has a large hole in | Hole |
| 63 | ||
|
| 76 | |||
the left side. Feed the Wire Harness (42) up into the |
| 42 |
| ||
|
| Bracket | |||
bracket on the Right Handrail and out of the large hole in |
|
|
| ||
the left side. Note: It may be helpful to use needlenose |
|
|
| 76 | |
pliers to pull the Wire Harness out of the large hole. |
|
|
| ||
|
| 63 |
| ||
Remove any plastic ties from the bracket. |
| 72 |
| ||
|
|
|
|
| |
Insert the bracket on the Right Handrail (72) into the top |
|
|
| 108 | |
| 38 |
|
| ||
of the Right Upright (108). Attach the Right Handrail with |
|
|
| ||
two 1” Bolts (63), two 1/4” Star Washers (76), two 2” | 114 |
|
| ||
Bolts (114), and two 1/4” Washers (38) as shown. | Do |
|
| ||
not tighten the Bolts yet. |
|
|
|
|
|
4. Open part bag C. | Attach the Storage Latch (36) to the |
| 4 |
|
|
Left Upright (73) with two 3/4” Screws (2). Make sure that |
|
| |||
|
|
| |||
the large hole in the Storage Latch is on the side shown. |
|
|
|
| |
|
|
| 30 | 36 | 73 |
Remove the Lock Knob (30) from the Lock Pin (35). |
|
| |||
|
|
|
| ||
Make sure that the Lock Pin Collar (33) and the Spring |
|
|
|
| |
(32) are on the Lock Pin as shown. Insert the Lock Pin |
|
|
| 32 | |
into the Storage Latch (36), and tighten the Lock Knob |
| 2 |
| ||
|
| 35 | |||
back onto the Lock Pin. |
|
| Large Hole |
| |
|
|
|
|
| |
Attach the Left Handrail (not shown) to the Left Upright |
|
|
| 33 |
(73)as described in step 3. Note: There is not a wire har- ness on the left side.
7