17.Lubricate the welded bolts on the Top Frame (24) and the Left Base (26).
Attach a Pulley Bracket (28) to each of the welded bolts with a 1/2Ó Nylon Locknut (60). Note: Make sure the Pulley Brackets are oriented correctly. The Bracket on the Top Frame (24) must have the welded cable trap pointed upwards. The bracket on the Left Base (26) must have the welded cable trap pointed downward.
18.Wrap the Cable (45) around a 3 1/2Ó Pulley (35) in the direction shown. Attach the Pulley to the Pulley Bracket (28) on the Top Frame (24) with an M10 x 50mm Bolt (73) and an M10 Nylon Locknut (1).
19.Wrap the Cable (45) around a 3 1/2Ó Pulley (35) in the direction shown. Attach the Pulley and a Cable Trap (40) to the Weight Carriage (37) with an M10 x 39mm Bolt (39). Make sure the Cable Trap is posi- tioned as shown, so it will hold the Cable in place.
17 | 24 |
|
Welded | Welded Bolt |
|
Cable |
| |
(Lubricate) |
| |
Trap |
| |
|
| |
28 |
|
|
| 60 |
|
| 60 |
|
| 28 |
|
| Welded |
|
| Cable |
|
| Trap |
|
| Welded Bolt |
|
| (Lubricate) |
|
| 26 |
|
18 |
|
|
24 | 73 |
|
|
| |
| 28 |
|
|
| 45 |
| 35 | 1 |
|
| |
| 42 |
|
19 | 39 |
|
|
| |
| 40 |
|
| 45 |
|
| 35 |
|
| 37 |
|
12