ASSEMBLY
To hire an authorized service technician to assemble the elliptical exerciser, call
Assembly requires two persons. Place all parts of the elliptical exerciser in a cleared area and remove the | ||||||
packing materials. Do not dispose of the packing materials until assembly is completed. In addition to the | ||||||
included allen wrenches, assembly requires your own phillips screwdriver |
|
|
|
| and rubber | |
|
| |||||
|
|
| ||||
|
|
|
| |||
|
|
|
| |||
mallet | . |
|
|
|
|
|
As you assemble the elliptical exerciser, refer to the drawings below to identify the small parts used in assembly. The number in parentheses below each drawing is the key number of the part, from the PART LIST on page 17. The number following the parentheses is the quantity used in assembly. Note: Some small parts may have been preassembled. If a part is not in the parts bag, check to see if it is preassembled.
M4 x 16mm | M4 x 19mm | M8 Jam Nut |
| M10 Nylon | M10 Split | M10 Washer |
Screw | Screw | Locknut | Washer | |||
M4 x 16mm | M8 x 38mm Button | M8 x 41mm Button | M8 x 44mm Button | |||
Round Head | ||||||
Screw | Bolt |
| Bolt | Screw | ||
| M10 x 55mm |
|
| M10 x 90mm Carriage |
| |
| Carriage Bolt |
|
|
| Bolt |
|
|
| Bolt Set |
|
| M10 x 20mm Button | |
|
|
|
|
| Screw |
|
1. Identify the Front Stabilizer (8). While another person | 1 |
| 89 | |||
lifts the front of the Frame (1), attach the Front |
|
| ||||
Stabilizer to the Frame with two M10 x 90mm Carriage |
| 1 |
| |||
Bolts (90) and two M10 Nylon Locknuts (89). |
|
|
| |||
|
|
|
| 90 |
|
|
|
|
|
|
| 8 |
|
|
|
| 4 |
|
|
|