
3.Identify the Right Handlebar (36), which is marked with an “R” sticker. Orient the Right Handlebar as shown; make sure that the hexagonal holes are in the indicated loca- tion.
Slide the Right Handlebar (36) onto the Right Upper Body Arm (37). Then, connect the Right Controller Wire (82) to the Right Extension Wire
Tip: Avoid pinching the wires during this step. Attach the Right Handlebar (36) with two M8 x 40mm Button Screws (67) and two M8 Locknuts (68). Make sure that the Locknuts are inside the hexagonal holes.
Attach the Inner Wire Cover (80) to the Right Upper Body Arm (37) with an M4 x 16mm Screw (72). Orient an Outer Wire Cover (81) as shown and attach it to the Right Upper Body Arm with three M4 x 16mm Screws (72).
Attach the Left Handlebar (22) in the same way.
4.Orient the Water Bottle Holder (6) as shown. Hold the Water Bottle Holder near the Frame
(1)and insert the Wire Harness (73) and the Right and Left Extension Wires (83, 86) upward through the Water Bottle Holder.
Next, slide the Water Bottle Holder (6) onto the Frame (1). Attach the Water Bottle Holder with two M4 x 35mm Screws (74).
3 |
|
|
|
Avoid pinching the |
| 36 | |
wires during this step |
| ||
83 | 82 |
| 68 |
22 | 67 |
| Hexagonal |
37 | Holes | ||
80 |
| 81 | |
|
| ||
72 |
|
| 72 |
|
|
|
4 |
| |
6 | 74 | |
86 | ||
| ||
73 | 83 | |
1 | ||
|
7