20. Route the Cable (79) up through the Lat Tower | 20 |
|
|
|
(48) and around an 89mm Pulley (65). Attach the |
| 79 |
| |
|
|
| ||
Pulley inside of the Lat Tower with an M10 x |
|
|
|
|
75mm Bolt (30), two M10 Washers (74), two Long | 74 |
| 65 | 48 |
Spacers (67), and an M10 Nylon Locknut (32). |
| |||
67 |
| |||
Make sure the large ball on the Cable is in the | 32 |
|
| |
|
|
| ||
indicated position. |
|
|
|
|
|
|
| 74 |
|
|
|
| 67 |
|
|
|
| 30 |
|
|
|
| Large |
|
|
|
| Ball |
|
21. Wrap the Cable (79) around an 89mm Pulley | 21 |
|
|
|
(65). Attach the Pulley and a Cable Trap (64) to |
|
|
| |
|
| 65 |
| |
the bracket on the Lat Tower (48) with an M10 x |
|
|
| |
|
|
|
| |
75mm Bolt (30). Make sure the Cable Trap is | 79 |
| 64 | |
inside the bracket and oriented to hold the |
| |||
|
|
|
| |
Cable in the groove of the Pulley. |
|
|
|
|
Note: Do not put an M10 Nylon Locknut (not |
|
| 30 |
|
shown) on the M10 x 75mm Bolt (30) yet. |
|
|
| |
|
|
|
| |
|
|
| 48 |
|
22. Wrap the Cable (79) around an 89mm Pulley | 22 |
|
|
|
(65). Attach the Pulley and a Cable Trap (64) to |
|
|
| |
| 32 | 79 |
| |
the Weight Carriage (50) with an M10 x 45mm |
|
| ||
|
|
|
| |
Bolt (27) and an M10 Nylon Locknut (32). Make |
|
| 65 |
|
sure the Cable Trap is outside the bracket and |
|
|
|
|
oriented to hold the Cable in the groove of the |
|
|
|
|
Pulley. |
|
| 64 |
|
|
|
|
| |
| 50 |
| 27 |
|
23. Wrap the Cable (79) around an 89mm Pulley | 23 |
|
|
|
(65). Attach the Pulley and a Cable Trap (64) to |
|
|
| |
|
|
|
| |
the bracket on the Lat Tower (48) with the M10 x |
| 64 |
| 65 |
75mm Bolt (30) used in step 21 and an M10 |
|
| ||
|
|
| ||
Nylon Locknut (32). Make sure the Cable Trap |
| 32 |
|
|
is oriented to hold the Cable in the groove of |
|
|
| |
|
|
|
| |
the Pulley. |
|
|
|
|
|
|
|
| 79 |
|
|
| 30 |
|
| 48 |
|
|
12