Weider PRO 9400 user manual Long Cable Trap is positioned to hold Cable in place

Page 12

CABLE ASSEMBLY

18. Wrap the High Cable (58) around a ÒVÓ-Pulley

18

 

 

 

 

(50). Attach the ÒVÓ-Pulley and a Long Cable

 

 

86

 

 

 

 

31

Trap (31) to the indicated bracket on the Front

 

 

58

 

Upright (42) with a 3/8Ó x 2 1/2Ó Bolt (86) and

 

 

 

 

a 3/8Ó Nylon Locknut (21). Be sure that the

 

 

 

 

50

Long Cable Trap is positioned to hold the

 

 

 

 

Cable in place.

 

 

 

 

 

 

 

 

 

 

Bracket

 

 

 

21

 

 

 

 

 

42

 

 

19. Route the High Cable (58) around the ÒVÓ-

19

 

 

 

 

Pulley (50) on the Left Arm (47). Be sure that

 

 

 

31

 

 

 

86

the Cable is in the groove of the Pulley

 

 

 

 

 

50

 

 

 

 

 

and that the Long Cable Trap (31) is posi-

 

 

 

 

 

 

 

 

 

tioned to hold the Cable in place. Tighten

 

 

 

 

 

the 3/8Ó x 2 1/2Ó Bolt (86) and the 3/8Ó Nylon

 

 

 

 

 

Locknut (not shown).

 

 

 

 

 

 

 

 

58

 

 

 

 

 

 

47

 

20. Route the High Cable (58) around the ÒVÓ-

20

 

 

 

 

Pulley (50) on the Right Arm (48). Be sure

 

 

86

50

 

 

31

that the Cable is in the groove of the ÒVÓ-

 

 

 

 

 

 

 

 

 

Pulley and that the Long Cable Trap (31) is

 

 

 

 

 

turned to hold the Cable in place. Tighten

 

 

 

 

 

the 3/8Ó x 2 1/2Ó Bolt (86) and the 3/8Ó Nylon

 

 

 

 

 

Locknut (not shown).

 

 

 

 

 

 

 

 

58

 

48

 

 

 

 

 

21. Attach the Pulley Bracket (20) to the Top

21

 

 

 

 

Frame (55) with the 5/16Ó x 5Ó Bolt (68) and a

 

68

 

 

 

 

 

 

5/16Ó Nylon Locknut (3). Do not over tighten

 

 

 

 

 

the Nylon Locknut; the Pulley Bracket

 

 

 

 

 

must be able to move freely.

 

 

 

 

 

See the inset drawing. Route the High Cable

 

55

 

66

 

 

 

 

 

(58) around the 3 1/2Ó Pulley (15) attached to

20

 

 

 

 

the Pulley Bracket (20). Tighten the 3/8Ó x 2Ó

 

 

12

 

 

 

 

15

Bolt (12) and a 3/8Ó Nylon Locknut (not

 

 

3

 

shown). Be sure that the Cable is in the

 

 

 

 

 

 

 

58

 

groove of the Pulley and that the Cable

 

 

 

 

 

 

 

 

 

Trap (66) is turned to hold the Cable in

 

 

 

 

 

place.

 

 

 

 

 

12

Image 12
Contents QUESTIONS? Model No. WESY39100 Serial NoCustomer HOT Line Table of Contents Limited WarrantyImportant Precautions Before YOU Begin Decal NoAssembly Frame AssemblyFollowing Tools not Included are Required for Assembly Òframe ASSEMBLY.ÓNylon Locknuts yet Tighten all Nylon Locknuts used in steps 1Ð5 Tube is sitting in the pin grooves in the top Weight Frame Assembly ARM Assembly Òarm ASSEMBLY.ÓDo not tighten the Nylon Locknut yet Retainers bend toward the Round Cover Cap, as shownARM Assembly Cable Assembly Long Cable Trap is positioned to hold Cable in place Nylon Locknut the Pulley Bracket Must be able to move freelyCable Assembly Assembly CableCable Assembly Make sure that the Cable 72 is between Locate the Leg Press Cable 78. Attach Seat Assembly Òseat ASSEMBLY.ÓPress a 1 1/2Ó Square Inner Cap 32 into the Leg Lever Seat Assembly HOW to USE the Home GYM System Changing the Weight SettingAdjusting the LEG Press Plate Attaching and Removing the SeatAttaching the LEG Lever to the LOW Pulley Station Weight Resistance Chart PlatesTROUBLE-SHOOTING and Maintenance Tightening the CablesCable Diagrams High Cable 58 and Low CableTOP View High CableMilitary Press Cable 72 and Leg Press Cable Leg Press CablePage Page Page Page Part LISTÑModel No. WESY39100 Exploded DRAWINGÑModel No. WESY39100 Ordering Replacement Parts