5.Press the Weight Tube Bumper (64) into the end of the Weight Tube (63). Insert the Weight Tube into the stack of Weights (25). Be sure that the pins on the Weight Tube are resting in the pin grooves in the upper Weight.
Lubricate the insides of the holes in the Top Weight (76). Set the Top Weight onto the stack of Weights (25).
Insert both Weight Guides (62) into the stack of Weights (25). Be sure that the holes in the Weight Guides are at the top, as shown.
FRAME ASSEMBLY
6.Attach the upper ends of the Weight Guides (62) to the Top Frame (55) with the 5/16” x 6” Bolt (60), two 1/2” x 3/4” Spacers (61), and a Nylon Locknut (3).
Be sure that the Pulley Bracket (20) is in front of the right Weight Guide (62) as shown.
| 7. Press a 1” x 7/8” Plastic Bushing (75) onto | |
ASSEMBLY | each welded spacer on the Press Frame (17). | |
Slide the Press Frame into place on the Base | ||
| ||
| (4). Note: This will be a tight fit. The | |
| Plastic Bushings should fit onto each end | |
| of the indicated tube in the Base. Be sure | |
| that the pulleys are on the indicated side. | |
ARM | Lubricate the 3/8” x 8” Bolt (59). Attach the | |
Press Frame (17) to the Base (4) with the | ||
| ||
| 3/8” x 8” Bolt and a 3/8” Nylon Locknut (21). |
7
5 |
|
|
|
| Holes |
|
| 62 |
| 76 |
|
|
| Lubricate |
|
| 63 |
|
| 64 |
| 25 |
|
6 | 61 |
|
| 3 | |
|
| |
|
| 55 |
| 60 | 20 |
|
| 62 |
7 |
|
|
|
| Pulleys |
|
| 17 |
|
| Lubricate |
|
| 59 |
|
| 21 |
|
| Welded |
| 4 | Spacers |
|
| 75 |