Weider WESY38730 user manual Locate the Long Cable 80. Insert one end

Page 10

15. Locate the Long Cable (80). Insert one end of

15

 

 

 

 

the Cable through the welded tube on the indicat-

 

 

 

 

 

 

 

 

 

ed end of the Cross Tube (11) and then through a

 

 

 

80

 

Swivel Arm (22). If necessary, use the tip of a

 

 

 

71

screwdriver to pull the end of the Cable out of the

 

 

 

10

 

 

 

 

Swivel Arm. Be sure the Cable is on the indicat-

 

 

 

 

 

 

11

 

ed side of the welded rod in the Swivel Arm.

 

 

 

 

 

Insert the Swivel Arm (22) into the welded tube

 

 

28

 

22

 

 

 

 

on the Cross Tube (11). Secure the Swivel Arm

 

 

 

 

 

 

 

 

 

with an M4 x 5mm Screw (10).

 

 

 

 

Rod

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

76

 

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

 

 

 

(22) with an M10 x 42mm Button Head Bolt (71)

 

 

 

 

 

and an M10 Nylon Locknut (76).

 

 

 

 

 

16. Wrap the Long Cable (80) around a 90mm Pulley

16

 

 

 

 

(28). Attach the Pulley and a Pulley Guard (29) to

 

Flat

 

 

 

 

 

 

the indicated M10 x 140mm Carriage Bolt (73)

 

 

Edge

29

76

with an M10 Nylon Locknut (76). Make sure that

 

 

 

 

 

the flat edge of the Pulley Guard is on the side

 

 

 

 

 

shown.

 

 

 

 

80

 

 

 

 

 

28

 

 

 

73

 

 

17. Attach a Pulley Housing (56) to the indicated “U”-

17

 

 

 

 

channel on the 10-pound Center Resistance Bar

 

 

 

 

 

 

 

 

 

(44) with an M10 x 102mm Button Head Bolt (24),

 

 

 

 

 

two Pivot Bushings (74), and an M10 Nylon

 

 

 

 

 

Locknut (76).

 

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

44

 

 

 

 

76

 

 

 

(28). Attach the Pulley inside of the Pulley

 

 

 

 

 

 

 

“U”-channel

Housing (56) with an M10 x 42mm Button Head

74

 

 

 

 

Bolt (71) and an M10 Nylon Locknut (76).

 

76

 

71

 

 

 

 

 

 

 

 

 

56

 

 

 

 

 

 

 

 

28

 

74

 

 

 

 

 

 

 

 

 

80

24

 

 

 

 

 

 

 

18. Wrap the Long Cable (80) under a 90mm Pulley

18

 

 

 

 

(28) as shown. Attach the Pulley and a Pulley

 

 

 

 

 

 

 

 

 

Guard (29) to the Upright (3) with an M10 x

 

 

 

 

 

113mm Button Head Bolt (40) and an M10 Nylon

3

 

 

 

 

Locknut (76). Make sure the flat edge of the

 

28

 

 

 

 

 

 

Pulley Guard is on the bottom.

 

 

 

 

 

 

 

 

 

 

 

 

76

 

 

 

 

 

29

80

 

40

 

 

 

 

 

 

 

 

 

 

Flat

 

 

 

 

Edge

 

 

 

10

 

 

 

 

Image 10
Contents Model No. WESY38730 Serial No QUESTIONS?Customer HOT Line Table of Contents Important Precautions Assembled Dimensions Before YOU BeginAssembly Make Things Easier for YourselfPage Page Page Page Locate the Long Cable 80. Insert one end Flat edge of the Pulley Guard is on the side ShownFlat edge of the Pulley Guard is on the side Shown Adjusting the Seat AdjustmentsAdjusting the Backrest Attaching the Accessories Adjusting the ResistanceMake sure the rings are pushed against the Tray Using the Removable Resistance BarsStoring the Resistance System Cable Diagram Long CableExercise Guidelines Cooling Down Muscle ChartStaying Motivated Aerobic Exercise DateExercise Resistance Sets Reps Thursday Aerobic Exercise DateMonday Page Part Identification Chart Part LIST-Model No. WESY38730 Qty DescriptionExploded DRAWING-Model No. WESY38730 Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT