36.Remove the preattached 3 1/2” Pulley (not shown) from the
Attach the end of the Leg Lever Cable (75) to the
37.Locate the VKR Low Cable (72), which is the only remaining cable that has an eyelet on one end and a ball on the other end. Route the eyelet end of the Cable through the cage on the Long Base (120) and through the VKR Upright (5) as shown.
Attach a 3 1/2” Pulley (78) to the indicated bracket on the Long Base (120) with 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).
38.Wrap the VKR Low Cable (72) under a 3 1/2” Pulley (78). Attach the Pulley to the indicated brack- et on the Long Base (120) with a 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).
39.Wrap the VKR Low Cable (72) over a 3 1/2” Pulley (78). Attach the Pulley to the Offset Double “U”- bracket (61) with a 3/8” x 1 3/4” Bolt (93) and a 3/8” Nylon Locknut (87).
36 |
75 |
64 |
97 |
34 |
37 |
78 |
5 |
87 |
72 |
93 |
120 |
38 |
87 |
78 |
72 |
93 |
120 |
39 |
93 |
87 |
61 |
72 |
78 |
16