Installation
Cold water only supply
•If there is no hot water supply, attach the cold and hot hoses to the machine as normal. Then, attach both hoses to a
Y piece
•Once all connections have been made, turn on the tap(s) to check that there are no leaks, tighten by hand if necessary.
Electrical installation
Warning: This machine must be earthed
•Any electrical work required to install the washing machine should be carried out by a qualified electrician.
•Before using your machine, check that the plug and sockets match, and check that the voltage in your home corresponds
to the machine’s voltage.
This information is on the rating plate (see section 1 01).
•The machine should be plugged into an earthed socket which can be switched on & off, and that is easily accessible after installation.
•Do not use an extension cable or plug adapter.
•If the supply cord or plug are damaged disconnect the machine from the socket outlet immediately. The supply cord must only be replaced by Dyson or its appointed agents, as special purpose tools and service techniques are required.
•If the plug supplied needs to be removed it should be cut off and disposed of safely. Under no circumstances should the severed plug be inserted into a socket outlet as this will present an electric shock hazard.
European conformity information
This Dyson washing machine has been tested and conforms to the following European Directives:
73/23/EEC Low Voltage Directive. 93/68/EEC CE Marking Directive. 89/336/EEC EMC Directive.
503
When all the instructions on the previous pages have been completed, the machine can be installed into its operating position using the RollerjackTM handle (see section
•Using the Dyson spanner, adjust the two front feet so that the machine is perfectly stable and is touching the ground on all four corners and cannot rock.
•Do not use wood, carpet or other material to stabilise the washing machine.
After installation
• Run an empty 60oC cotton cycle with a half measure of detergent. For the correct dosage, please follow the manufacturer’s instructions on the detergent packaging.
(See sections 7 01 and 8 01 on how to start the machine).
•This will clean any test water out of the machine, and allow you to check that the machine is installed and levelled correctly.
•Observe it regularly during the first wash and check connections afterwards and during the first week, to ensure that they have been fitted correctly.