Installation and Connection Instructions | 4 |
|
|
Label 1
CAUTION
Ensure that the machine is installed on a level floor of sufficient strength and that the recommended clearances for inspection and maintenance are provided. Never allow the inspection and maintenance space to be blocked.
Surface
The machine must be placed on a flat, solid surface (metal base, concrete or solid ground). When using a metal base or with machines with steam heating, the machine must be anchored on the 4 provided locations (A) (See Label 1) in the base. (See Mounting Bolt Hole Locations). The height of the pad should not exceed 203 mm - 8 inch.
The machine must be placed entirely level. For easy maintenance it is recommended to keep a minimal distance of 600 mm - 23.62 inch between the wall and the back of the machine.
If several machines are placed next to each another, there should be a minimal distance of 30 mm - 1.18 inch between each machine.
Removal of the transport safety
To prevent damage during transportation, the machine has been equipped with four red transport brackets to eliminate every possible movement of the tub.
After the machine has been placed level, take off the service panel and back panel to remove these transport brackets. (See Label 2)
Important
The machine must never be activated before removing these transport brackets. If the machine needs to be moved from the installed location, first reinstall the four red transport brackets.