Sears Clothes Dryer Replacing nylon timing cams on accumulator mechanism, Changing Vend Price

Page 14

Replacing nylon timing cams on accumulator mechanism

Electrical Shock Hazard

Disconnect power before servicing.

Replace all panels before operating,

Failure to do so can result in death or electrical shock.

1.Unplug dryer or disconnect power.

2.Remove meter-case service door:

Loosen two screws securing timer bracket to meter case and lift timer assembly out.

3.Remove nylon timing cam:

Rotate cam by hand until "V" notch lines up under- neath the ratchet tooth.

Timing Cam

Line Up Notch to Clear Ratchet Tooth

Hub Down

with Narrow

 

Blade

Insert narrow screwdriver under nylon cam close to the timer shaft. Lift cam gently off shaft. Make sure that pressure is directed upward and the "V" notch clears the ratchet tooth.

4.Replace new timing cam:

Be sure drive lug is in place. Place cam (hub down) over timer shaft, lining up flat on shaft with fiat of drive lug hole.

Rotate cam until "V" notch lines up with ratchet tooth.

Press down to seat cam on timer shaft. Make sure that "V" notch freely clears ratchet tooth.

 

NUMBER

TIME PER

 

OF PINS

COIN INSERTED

6 Light Red

30

4

Light

Yellow

45

3

Light

Green

60 (Installed)

5. Plug in dryer or reconnect power.

Changing Vend Price

Follow all instructions carefully.

NOTE: Place all screws and other items removed from coin slide assembly on a cloth so they will not get lost.

Electrical Shock Hazard

Disconnect power before servicing.

Replace all panels before operating. Failure to do so can result in death or electrical shock.

1.Unplug dryer or disconnect power.

2.Remove slide mechanism from meter case.

3.Remove slide return spring.

4.Place coin(s) in coin slot(s) and push forward all the way.

5.Remove buffer.

6.Turn coin chute upside down and install or remove required number of block-out keys. Remove keys to increase vend, add keys to lower vend.

7.Reassemble buffer.

8.Pull slide back to original position and reassemble slide return spring.

14

Image 14
Contents Table of Contents COIN-OPERATED Commercial ElectricdryerDryer Safety Instructions Tools needed for installationThree-Wire Electrical Connection to Receptacle Strainrelief whiteorcenterThree-Wire Electrical Connection Direct Wire Terminalblockcover Hold-downscrewOn next Four-Wire Electrical Connection to Receptacle Alternate ConnectionProng wimgreen terminals External terminalblockscrew Neutral wireGreenwire Ofpowersupply Cordorbare. copperwire Disconnect power Four-Wire Electrical ConnectionDirect Wire Leave bare grounding wire at 5 inchesArece,,erw re I III. gr0ced .,w re Determining vent length To determine maximum vent lengthMultiple dryer exhausting guide Cardboard Final installation connection Installing coin-slide mechanismCoin box adjustment Starting the dryer without using the coin mechanismReplacing nylon timing cams on accumulator mechanism Changing Vend Price=I.oo Iiddddii Opening dryer topDrying Time Operating the DryerTo close dryer top Lubrication InstructionsTroubleshooting Belt Drying temperature too high Operating thermostatLoose components Secure component MotorPage Sears