American Dryer Corp MDG30V installation manual Location Requirements

Page 13

B. LOCATION REQUIREMENTS

Before installing the dryer, be sure the location conforms to local codes and ordinances. In the absence of such codes or ordinances the location must conform with the National Fuel Gas Code ANSI.Z223.1 LATEST EDITION, or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1- M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing).

1.The dryer must be installed on a sound level floor capable of supporting its weight. Carpeting must be removed from the floor area that the dryer is to rest on.

IMPORTANT: “The dryer must be installed on noncombustible floors only.”

2.The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.

3.The dryer is for use in noncombustible locations.

4.Provisions for adequate air supply must be provided as noted in this manual (refer to Fresh Air Supply Requirements in Section D).

5.Clearance provisions must be made from combustible construction as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

6.Provisions must be made for adequate clearances for servicing and for operation as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

7.Dryer must be exhausted to the outdoors as noted in this manual (refer to Exhaust Requirements in Section E).

8.Dryer must be located in an area where correct exhaust venting can be achieved as noted in this manual (refer to Exhaust Requirements in Section E).

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

9.The dryer must be installed with a proper exhaust duct connection to the outside.

10.The dryer must be installed with provisions for adequate combustion and make-up air supply.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

9

Image 13
Contents MDG30V Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationExplosion could Result Safety PrecautionsPage Specifications SpecificationsMDG30V UNPACKING/SETTING UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Vertical Venting Multiple Dryer Common Venting Illus. C Important Venting Reminders Electrical Requirements Electrical InformationMust be Provided Single-Phase 1ø Wiring Connections/HookupSINGLE-PHASE 1Ø Electrical Connection Leads Important a Circuit Servicing Each Dryer Must be Provided MDG30V GAS Service Wire Approx Circuit Phase AMP Draw Voltage BreakerGAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsCoin Models Preoperational InstructionsPage OPL Models Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Standards TroubleshootingBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Excessive noise and/or vibration Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page 113365 1 04/22/02-25