e.Open main door. The dryer must stop and ALL output indicator lights on the back side of the microprocessor controller (computer) board must go out. (Refer to the illustration on the previous page.)
f.Try to restart the dryer with the main door open.
g.The microprocessor controller (computer) board’s light emitting diode (L.E.D.) display must read “DOOR.”
h.Close the main door and restart the dryer.
i.Functional check of microprocessor controller (computer) board is complete.
2.For Models With Johnson Controls Direct Spark Ignition (DSI) Module (G760) Theory Of Operation:
Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time
A steady L.E.D. indicator indicates normal operation.
No L.E.D. indicator indicates a power or an internal failure has occurred.
47