D. FRESH AIR SUPPLY REQUIREMENTS

The MDG30V air supply (make-up air) must be given careful consideration to assure proper performance of each dryer. An unrestricted source of air is necessary for each dryer. As a general rule, an unrestricted air entrance from the outdoors (atmosphere) of a minimum of 1-1/2 square feet (0.14 square meters) is required for each dryer. If registers or louvers are installed over the openings, then the area must be increased. It is not necessary to have separate make-up air openings for each dryer. Common make-up air openings are acceptable. However, they must be set up in such a manner that the make-up air is distributed equally to the dryers. The dryer must be installed with provisions for adequate combustion and make-up air supply.

EXAMPLE: For a bank of eight (8) dryers, two (2) unrestricted openings measuring 3 feet by 2 feet (0.914 meters by 0.61 meters) (6 square feet [0.557 square meters]) is acceptable.

IMPORTANT: Make-up air openings should not be located in an area directly near where exhaust vents exit the building.

Allowances must be made for remote or constricting passageways or where dryers are located at excessive altitudes or predominantly low pressure areas.

IMPORTANT: Make-up air must be provided from a source free of contaminating fumes such as dry cleaning solvent fumes. Make-up air that is contaminated by dry cleaning solvent fumes will result in irreparable damage to the motors and other dryer components.

NOTE: Component failure due to dry cleaning solvent fumes will VOID THE WARRANTY.

11

Image 15
Contents MDG30V Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationExplosion could Result Safety PrecautionsPage Specifications SpecificationsMDG30V UNPACKING/SETTING UP Installation ProceduresLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Vertical Venting Multiple Dryer Common Venting Illus. C Important Venting Reminders Electrical Requirements Electrical InformationMust be Provided Single-Phase 1ø Wiring Connections/HookupSINGLE-PHASE 1Ø Electrical Connection Leads Important a Circuit Servicing Each Dryer Must be Provided MDG30V GAS Service Wire Approx Circuit Phase AMP Draw Voltage BreakerGAS Information Type of GAS Page Page Preparation for OPERATION/START-UP GAS Models only Preoperational TestsCoin Models Preoperational InstructionsPage OPL Models Shut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Routine Maintenance CleaningSuggested Cleaning Schedule Lubrication AdjustmentsLint Drawer Removal Standards TroubleshootingBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Excessive noise and/or vibration Data Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components Page 113365 1 04/22/02-25