American Dryer Corp ML-96D installation manual G 9 6 D

Page 24

Each dryer should be connected to an independently protected branch circuit. The dryer must be connected with copper wire only. DO NOT use aluminum wire, which could cause a fire hazard. The copper conductor wire or cable must be of proper ampacity and insulation in accordance with electric codes for making ALL service connections.

NOTE: The use of aluminum wire will VOID THE WARRANTY.

IMPORTANT: Wiring diagrams are affixed to the inside at the top front control door and to the rear upper back guard or panel.

2.Electrical Service Specifications

M L G - 9 6 D

ELECTRICAL SERVICE SPECIFICATIONS (PER DRYER)*

SERVICE

 

WIRE

MINIMUM

APPROX.

CIRCUIT

PHASE

AMP DRAW

BREAKER

VOLTAGE

SERVICE

WIRE SIZE

60 Hz

50 Hz

60 Hz

50 Hz

 

 

 

 

2 0 8

3 ø

3/4

**

13 . 5

--

25

--

2 4 0

3 ø

3

**

12 . 5

--

25

--

3 8 0 - 4 0 0

3 ø

3/4

**

--

6 . 9

--

15

4 1 6

3 ø

3/4

**

--

6 . 6

--

15

 

 

 

 

 

 

 

 

460/480

3 ø

3/4

**

6.8

--

15

--

*Contact factory for information not listed.

**AWG Stranded Wire Type ... size wire as per National Electrical Code or local codes.

IMPORTANT: The dryer must be connected to the electric supply shown on the data label that is affixed to the left side panel/wall area behind the control door. In the case of 208 VAC or 240 VAC, the supply voltage must match the electric service specifications of the data label exactly.

IMPORTANT: The wire size must be properly sized to handle the related current.

WARNING: 208 VAC and 240 VAC ARE NOT THE SAME. Any damage done to dryer components due to improper voltage connections will automatically VOID THE WARRANTY.

NOTE: ADC reserves the right to make changes in specifications at any time without notice or obligation.

20

Image 24
Contents ML-96D Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Create a Potential Fire HazardAnywhere Downstream of Dryer Page Page Electrical Information G 9 6 D Electrical Connections GAS Information BTU Page Preparation for OPERATION/START-UP Preoperational Tests Operating Instructions Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Data LABEL/LOCATION Information Data LabelSerial Number Manual Reset HI-LIMIT Instructions For Phase 6 ModelsADC 02/16/00-10 12/08/00-10 03/09/01-25