American Dryer Corp ML-96D installation manual Preoperational Tests

Page 30

6.Be sure ALL side and base panels are on the dryer.

7.Check ALL service doors to insure that they are closed and secure.

8.Be sure the lint drawer is securely in place.

IMPORTANT: LINT DRAWER MUST BE CLOSED TO ACTIVATE SAFETY SWITCH

OTHERWISE THE DRYER WILL NOT START.

9.Rotate the basket (tumbler or drum) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.Check basket (tumbler) bearing setscrews to insure they are ALL tight.

I. PREOPERATIONAL TESTS

ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions.

1.Turn on electric power to the dryer.

2.Make sure the main door and lint drawer are closed.

3.Refer to the operating instructions for starting your particular model dryer.

4.Check to ensure the basket (tumbler) starts in the clockwise (CW) direction. Additionally, check the direction of the blower motor impellor (fan) to ensure the impellor (fan) rotates in the clockwise (CW) position as viewed from the front. If it is, the phasing is correct. If the phasing is incorrect, reverse two (2) of the leads at L1, L2, or L3 of the power supply connections made to the dryer.

IMPORTANT: Dryer blower motor impellor/fan as viewed from above must turn in the clockwise (CW) direction, otherwise dryer efficiency will drastically be reduced and premature component failure can result.

5.Heat Circuit Operational Test a. Gas Models

1)When the dryer is first started (during initial start-up), the burner has a tendency not to ignite on the first attempt. This is because the gas supply piping is filled with air, so it may take a few minutes for this air to be purged from the lines.

2)The dryer is equipped with a Direct Spark Ignition (DSI) system, which has internal diagnostics. If ignition is not established after the first attempt, the computer will go into retry mode. If ignition is not established after two (2) retries, no heat condition occurs.

NOTE: During the purging period, check to be sure ALL gas shutoff valves are open.

26

Image 30
Contents ML-96D Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Page Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Create a Potential Fire HazardAnywhere Downstream of Dryer Page Page Electrical Information G 9 6 D Electrical Connections GAS Information BTU Page Preparation for OPERATION/START-UP Preoperational Tests Operating Instructions Basket CoatingShut Down Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Data LABEL/LOCATION Information Data LabelSerial Number Manual Reset HI-LIMIT Instructions For Phase 6 ModelsADC 02/16/00-10 12/08/00-10 03/09/01-25