American Dryer Corp ML-78 installation manual

Page 38

5.Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI, steam damper operation must be checked before the dryer is put into operation. Refer to page 33 or instructions to check steam damper operation. If steam damper adjustment is necessary, locate the flow control valve and make the necessary adjustments as noted below.

34

Image 38
Contents ML-78 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Dryer Rear View Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Page Exhaust Requirements Not be Reduced Anywhere Down Stream of the Dryer Reduced Anywhere Down Stream of the Dryer Page Electrical Information MLG-78 Gas MLS-78 Steam Page Black Positive White Neutral Green Ground Page Electrically Heated Models only Page GAS Information Type of Gas Page Page Steam Information Operating Steam PressureSteam Damper System Compressed Air Supply Air Pressure Page Page Preparation for OPERATION/START-UP Preoperational Tests Page Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Routine Maintenance CleaningSteam Dryers Reversing Timer SPIN/DWELL Adjustments Timing LegendData Label LOCATION/INFORMATION Data LabelSerial Number Procedure for Functional Check Replacement Components SectionADC113029