American Dryer Corp MDG75V Important a Circuit Servicing Each Dryer Must be Provided

Page 26

5.3-Phase (3ø) Wiring Connections/Hookup (for non-reversing models only)

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes Neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

IMPORTANT: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

a.Gas Models

1)3-Phase (3ø) Wiring Connections/Hookup

For gas dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the

service box at the rear, upper left corner of the dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the service box and contactor, the service box cover must be removed.

If local codes permit, power to a gas dryer can be made by the use of a flexible U.L. listed power cord or pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer and service box area.

22

Image 26
Contents MDG75V Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage Specifications SpecificationsMDG75V Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationPage Page Multiple common Dryer Venting Importantventingreminders Electrical Information Electrical RequirementsMust be Provided SINGLE-PHASE 1Ø Electrical Connections Leads Important a Circuit Servicing Each Dryer Must be Provided Page MDG75V GAS GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests GAS Models onlyBasket Tumbler Coating Preoperational Instructions Shutdown InstructionsParts SERVICE/PARTS InformationService Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationLint Drawer Removal Troubleshooting Microprocessor Controller Computer ModelsBlower motor is not operating does not start Microprocessor controller computer display reads dSFL GAS Models only Dryer operates but is taking too long to dry Dryer is making scraping noise at basket tumbler area Data Label Information Data LabelSerial Number Procedure for Functional Check Replacement Components SectionviiiPage 113160 1 11/27/02-25